HZL RD Mines Dariba, Rajsamand
Projects Executed by Udai Enterprises (As Sub-Contractor)
Our Engagement at HZL RD Mines Dariba
We have maintained a strong and trusted partnership with HZL RD Mines Dariba, Rajsamand, executing multiple projects over the years across steel structure fabrication, piping, blasting & painting, tank fabrication, and equipment erection. Our collaboration with the site team has been consistently smooth and efficient, allowing us to deliver high-quality work while adhering to technical specifications, safety protocols, and project timelines. This long-term engagement has reinforced client confidence in our ability to handle complex and large-scale mining projects reliably.
Year :
2023-24
Owner :
HZL RD Mines Dariba, Rajsamand
Vendor :
KEC International Ltd.
Project Site :
HZL RD Mines Dariba
Work Nature :
Steel Structure Fabrication
Order Value :
2 Cr
Year :
2023-24
Owner :
HZL RD Mines Dariba, Rajsamand
Vendor :
KEC International Ltd.
Project Site :
HZL RD Mines Dariba
Work Nature :
HDPE Piping, MS Piping & Blasting Painting Work
Order Value :
2.6 Cr
Year :
2021–22
Owner :
HZL RD Mines Dariba, Rajsamand
Vendor :
FLSmidth
Project Site :
HZL RD Mines Dariba
Work Nature :
Fabricated Tank, Structure & Handrail Work
Order Value :
2.1 Cr
Year :
2021–22
Owner :
HZL RD Mines Dariba, Rajsamand
Vendor :
FLSmidth
Project Site :
HZL RD Mines Dariba
Work Nature :
Thickener, Tank Erection, Piping & Equipment Work
Order Value :
8.3 Cr
Project Overview
This project involved the fabrication of heavy steel structures essential for the operational infrastructure at the HZL RD Mines Dariba site. All fabrication activities were conducted adhering strictly to engineering specifications and quality standards, ensuring structural integrity and durability. Safety protocols were a key focus throughout the project to protect personnel and maintain project timelines.
Key Highlights:
- Fabrication of 800 MT of steel structures.
- Compliance with international quality and safety standards.
- Timely completion to support mine operational schedules.
Project Impact:
The fabricated steel structures provide critical support for mining operations, contributing to enhanced facility robustness and longevity. The project reinforced our reputation for delivering high-quality structural fabrication services on time.
Project Information
Vendor :
KEC International Ltd.
Project Site :
HZL RD Mines Dariba
Work Nature :
Steel Structure Fabrication
Order Value :
2 Cr
Project Overview
This project involved the fabrication and erection of HDPE piping at the HZL RD Mines Dariba site. The scope included precise cutting, welding, and installation of 33,000 Inch Meter of piping, ensuring leak-proof joints and alignment as per engineering specifications. All work was performed following strict safety protocols and quality standards.
Key Highlights:
- Fabrication and erection of 33,000 Inch Meter HDPE piping.
- Strict adherence to engineering and quality standards.
- Timely execution while maintaining safety compliance.
Project Impact:
The HDPE piping installation ensured reliable material flow and operational efficiency at the mine. High-quality execution reinforced client confidence in our engineering and installation capabilities.
Project Information
Vendor :
KEC International Ltd.
Project Site :
HZL RD Mines Dariba
Work Nature :
HDPE Piping, MS Piping & Blasting Painting Work
Order Value :
60 Lakh
Project Overview
This project involved the fabrication and erection of MS piping at the HZL RD Mines Dariba site. The scope covered precise cutting, welding, and installation of 65,662 Inch Meter of piping, ensuring full compliance with engineering specifications and quality standards. All work was executed with strict adherence to safety protocols to ensure reliable and efficient operations.
Key Highlights:
- Fabrication and erection of 65,662 Inch Meter MS piping.
- Compliance with engineering and quality standards.
- Timely completion while maintaining full safety compliance.
Project Impact:
The MS piping installation enhanced the operational efficiency of the mine, ensuring smooth material flow. High-quality execution reinforced client confidence in our mechanical and piping capabilities.
Project Information
Vendor :
KEC International Ltd.
Project Site :
HZL RD Mines Dariba
Work Nature :
MS Piping Fabrication & Erection
Order Value :
1.5 Cr
Project Overview
This project involved blasting and painting of steel structures and piping at the HZL RD Mines Dariba site. The scope included surface preparation, sand blasting, and application of high-quality protective coatings to 700 MT of structures and pipes, ensuring corrosion resistance and long-term durability. All work adhered to strict safety and quality standards.
Key Highlights:
- Blasting and painting of 700 MT of structures and piping.
- Use of high-quality protective coatings for durability.
- Compliance with safety and quality standards throughout the project.
Project Impact:
The project enhanced the longevity and operational reliability of the mine’s structural and piping systems. High-quality execution reinforced client trust and ensured long-term performance.
Project Information
Vendor :
KEC International Ltd.
Project Site :
HZL RD Mines Dariba
Work Nature :
Structure & Pipe Blasting and Painting
Order Value :
50 Lakh
Project Overview
For this project, we executed fabrication of tanks, structural components, and handrails at the site. The work involved precise fabrication, assembly, and installation, maintaining strict adherence to technical and safety standards.
Key Highlights:
- Fabrication and installation of tanks and structural components.
- Handrails fabricated and installed with precision.
- Ensured compliance with safety protocols throughout the project.
Project Impact:
The project ensured operational readiness and safety for plant personnel. High-quality fabrication and timely execution strengthened client trust in our technical capabilities.
Project Information
Vendor :
FLSmidth
Project Site :
HZL RD Mines Dariba
Work Nature :
Fabricated Tank, Structure & Handrail Work
Order Value :
2.1 Cr
Project Overview
This project involved thickener erection, tank installation, piping, and equipment erection at HZL RD Mines Dariba. The scope included precise assembly, alignment, and installation of critical plant equipment and structures with strict adherence to quality and safety standards.
Key Highlights:
- Erection and alignment of thickener, tanks, and equipment.
- Piping installation executed according to technical specifications.
- Piping installation executed according to technical specifications.
Project Impact:
The project ensured operational efficiency and structural integrity of critical plant systems. Timely execution, quality adherence, and safe working practices reinforced client confidence in our large-scale project delivery capabilities.